Recommendation |
Time Frame |
| 50 |
Perimeter wall along setbacks are discouraged |
6-30 months |
| 51 |
Do not allow continous walls; maintain wildlife settings |
6-30 months |
| 52 |
Walls next to or within 50' of corridor to be a maximum height of 4' |
9-36 months |
| 53 |
No wall should exceed 5' within 50' of a corridor |
6-15 months |
| 54 |
Avoid canyon effect by using creative design solutions |
6-24 months |
| 55 |
Walls should be located so scenic views are maintained |
6-30 months |
| 56 |
Walls should blend with desert terrain in form, color and material |
6-24 months |
| 57 |
Limit maximum building heights next to corridor to 18' or by a setback
plane |
9-36 months |
| 58 |
Adopt building design standards to blend with desert setting and character |
1-4 years |
| 59 |
Limit sign sizes, numbers and locations |
#16, #18, #19, #24, #45 |
| 60 |
Limit sign sizes, numbers and locations |
See #55 |
| 61 |
No drainage basins should be placed within 200' of a corridor |
1-5 years |
| 62 |
Form of basin in or near corridors should blend with the natural desert |
9-30 months |
| 63 |
Consider applying scenic corridor status to other streets |
1-2 years (-10 years) |
| 64 |
If new corridors are designated, maintain funding priority on existing
corridor |
1-3 years |
| 65 |
Place recommended policies in enforceable document(?)/accounting process |
1-2 years |
| 66 |
Keep recommendations together for easy accessibility |
1-2 years |
| 67 |
Identify one staff point of contact |
1-2 years |
| 68 |
Amend General Plan as needed - complete landscaping section of Design
Guidelines |
See prior recommendations |
| 69 |
Project Review/Coordination begin stipulating cases according to
recommendations as soon as possible |
3-12 months |
| 70 |
Prepare specific design standards for each corridor |
1-5 years |
| 71 |
Begin city projects to improve corridors |
2-4 years |
| 72 |
Integrate scenic drives into the trails path and system |
3-12 months |
| 73 |
If grandfathered uses, change require new development to restore corridor
desert |
2-5 years |
| 74 |
Investigate setting time frame that non-conforming developments meet new
standards |
2-10 years |
| 75 |
Semi-annual "roundtables"; piggyback on to sustainability
indicators |
1-2 years |